A great experience from this family-owned business. Janeth provided me with a complete and understandable quote, and Bolivar and his crew completed the job with speed and professionalism. The entire job, not including a couple of rain days, took less than 4 days. They removed a medium-sized tree and a bit over 1,000 sq. ft. of grass in 3 different areas, prepared all 3 areas with base material, installed weed barriers and two large mow curbs around the remaining trees, and installed top-quality artificial turf in all 3 areas. They cleaned up and hauled everything away, leaving my yard looking like a million dollars.
We install artificial grass, concrete, pavers, block walls, drainage and lighting for homes in Ontario, CA, from Ontario Ranch neighborhoods like New Haven, Park Place and Grand Park to the older streets near downtown and Euclid Avenue. Call or text (951) 556-0315 for a free on-site quote. Licensed #1112345 and insured.
Work from our crew



Ontario rules at a glance
- 45%
- Max hardscape in a front yardArtificial turf counts toward it, along with the driveway, walks and gravel.
- Garage
- Max driveway widthPlus one side access up to 10 ft to a parking area.
- 3 ft
- Wall or fence in a front yardSide and rear walls can go to 6 ft.
- 3 ft
- Retaining wall next to a streetMore than that gets tiered walls.
What that means for your yard
On a traditional single-family lot, the driveway, walkway, gravel and artificial grass together can cover at most 45% of the front yard the street sees. The rest stays planted. We measure it first, then decide where the turf goes.
A wider driveway is limited by the garage width, so most concrete work here is a replacement or a 10 ft side access. Ontario lists a $2 per square foot turf replacement rebate, but the regional SoCal Water$mart program does not accept synthetic turf, so ask us before you plan on it.

Getting there from Perris
We take the 215 north to the 60 west. For Ontario Ranch we go from the 60 to the 15 south and get off at Ontario Ranch Road, about 32 miles and 40 minutes without traffic. Downtown and City Hall are the 60 to Haven Avenue, then Mission Boulevard, about 36 miles and 45 minutes. The 60 is slower at rush hour, so we plan Ontario jobs to start on site early.


